5 Marla House Construction Cost in 2026 | Complete A–Z Guide

🏠 Construction Cost Guide • Pakistan 2026

5 Marla House Construction Cost in Pakistan 2026

A complete A-to-Z guide to building a modern double-storey 5 Marla house — including grey structure, cement, steel, bricks, sand, crush, tiles, windows, doors, paint, electrical, plumbing, kitchen, bathrooms, false ceiling, labour and contractor costs.

📅 Updated for October 2026 • Rates are indicative and should be verified with local suppliers before purchase.
Typical Covered Area ~1,900–2,000 sq ft
Economy Budget ~Rs 90–98 Lakh
Recommended Budget ~Rs 1.10–1.25 Cr
Construction Period ~8–13 Months

5 Marla House Construction Cost in 2026

The cost of constructing a 5 Marla house in Pakistan depends on the covered area, city, structure, material quality, finishing specification and contractor. A double-storey 5 Marla house in Rawalpindi or Islamabad can cost substantially more than a basic shell because the final budget includes flooring, doors, windows, kitchen, bathrooms, electrical work, plumbing, paint and other finishing items.

For a typical double-storey house of approximately 1,900–2,000 square feet covered area, a realistic 2026 planning budget is approximately Rs 90 lakh to Rs 1.25 crore, depending on quality. Premium specifications can push the budget considerably higher.

Important: Construction cost is calculated primarily according to covered area, not simply the number of Marla. Two 5 Marla houses can have different costs because their covered areas and specifications may be different.

5 Marla Double-Storey House Construction Cost

For budgeting purposes, the following ranges can be used for a typical 5 Marla double-storey house. These are planning ranges, not fixed contractor quotations.

Economy Construction

Rs 90–98 Lakh
  • Basic but usable finishing
  • Local good-quality tiles
  • Standard aluminium windows
  • Simple false ceiling
  • Economical sanitary fittings
  • Simple elevation

Premium Finish

Rs 1.25–1.50 Cr+
  • Premium flooring
  • Premium kitchen
  • Better doors and windows
  • Decorative ceilings
  • Higher-end sanitary
  • Premium exterior elevation

Current Construction Material Rates in Rawalpindi & Islamabad 2026

Material prices can change because of brand, quantity, transport, supplier and market conditions. The following figures are useful as a budgeting benchmark.

Material Approx. Rate Unit Budgeting Note
Cement Rs 1,400–1,550 50kg Bag Brand and dealer dependent
Grade-60 Steel Rs 245–265 Kg Verify mill/dealer rate
A-Class Bricks Rs 17–27 Piece Quality and transport affect price
Sand Rs 120–140 CFT Source and quality dependent
Crush / Aggregate Rs 145–165 CFT Quality and delivery affect price
Floor Tiles Rs 350–700+ Sq Ft Local to premium options
Aluminium Windows Rs 2,000–3,500+ Sq Ft Profile, glass and hardware dependent
Don't treat online rates as a purchase order. Before purchasing large quantities of cement, steel, bricks or aggregate, obtain a written quotation from at least two or three local suppliers.

5 Marla Double-Storey House Material Quantity Estimate

For approximately 1,900–2,000 sq ft covered area, the following quantities can be used as an initial budgeting estimate. The final BOQ must be prepared from the architectural and structural drawings.

Bricks 50,000–63,000
Cement 700–830 Bags
Grade-60 Steel 4.5–5.0 Tons
Sand 3,000–3,800 CFT
Crush 2,000–2,500 CFT
Binding Wire 100–150 KG
Covered Area ~1,900–2,000 Sq Ft
Floors Ground + First
Structural warning: Cement and steel quantities are affected by the structural design, soil condition, column spacing, beam sizes, slab thickness and foundation type. Never finalize structural quantities using an internet calculator alone.

Foundation & Excavation Cost

Foundation work is the first major construction stage. It includes site layout, excavation, soil preparation, PCC, reinforcement, footings, columns, foundation walls, DPC, backfilling, termite treatment and plinth-level work.

01

Site Layout

Mark the house according to approved architectural drawings.

02

Excavation

Excavate according to structural and soil requirements.

03

Footings

Construct reinforced concrete footings as designed by the engineer.

04

Columns

Install reinforcement and cast structural columns.

05

DPC

Install damp-proofing to reduce rising damp problems.

06

Backfilling

Properly compact filling before floor and plinth construction.

Estimated foundation budget: approximately Rs 7–11 lakh, depending on soil, excavation depth and structural requirements.

5 Marla House Grey Structure Cost

Grey structure generally includes excavation, foundation, reinforced concrete columns, beams, slabs, brick masonry, plaster, damp-proofing and embedded electrical and plumbing work.

Grey Structure Component Estimated Budget
Foundation & excavation Rs 7–11 Lakh
Steel / Sariya Rs 11.5–13.5 Lakh
Cement Rs 10.5–12.5 Lakh
Bricks Rs 9–13 Lakh
Sand Rs 3–4.5 Lakh
Crush / Aggregate Rs 2.6–4 Lakh
Binding wire & miscellaneous Rs 1–2 Lakh
Rough plumbing & electrical conduits Rs 1.5–3 Lakh
Grey structure labour Rs 10–15 Lakh
Estimated Grey Structure Rs 60–75 Lakh

Cement & Steel Requirement for a 5 Marla House

How Much Cement Is Required?

A typical 5 Marla double-storey house may require approximately 700–830 bags of cement, depending on the structural design and finishing work.

How Much Steel Is Required?

A practical initial estimate is around 4.5–5 tons of Grade-60 reinforcement steel.

Example: At Rs 250/kg, 5 tons of steel would cost approximately Rs 12.5 lakh.

The actual quantity should come from the structural engineer's bar bending schedule rather than a generic internet estimate.

Bricks, Sand & Crush Quantity

Material Approx. Quantity Typical Use
A-Class Bricks 50,000–63,000 Walls and masonry
Sand 3,000–3,800 CFT Concrete, masonry, plaster
Crush 2,000–2,500 CFT RCC structure
Binding Wire 100–150 KG Steel reinforcement

Plaster & Masonry Cost

Internal and external plaster should include proper surface preparation and treatment at brickwork-to-RCC junctions.

  • Internal wall plaster
  • External wall plaster
  • Ceiling plaster where required
  • Corner finishing
  • Mesh at critical RCC/masonry junctions
  • Surface preparation
Estimated plaster budget: approximately Rs 4–6 lakh.

Floor Tiles & Flooring Cost

Flooring is one of the most visible parts of a house. For an economical modern house, locally available porcelain or ceramic tiles can provide a good balance between appearance and cost.

Recommended Economical Specification

  • 60×60 cm porcelain tiles for living areas
  • Anti-slip tiles for bathrooms
  • Kitchen floor tiles
  • Bathroom wall tiles
  • Kitchen backsplash
  • Proper tile adhesive/grout
Budget: approximately Rs 6–9 lakh for flooring, bathrooms, kitchen and associated tile work depending on area and tile selection.

Doors & Windows Cost for a 5 Marla House

Item Economy Average
Main Entrance Door Rs 1–2 Lakh Rs 2–4 Lakh
Bedroom Doors Rs 30–50k each Rs 50–80k each
Bathroom Doors Rs 15–30k Rs 30–50k
Aluminium Windows Rs 2,000–2,700/sq ft Rs 2,700–3,500+/sq ft
Total Doors + Windows Rs 5–6.5 Lakh Rs 7–10 Lakh

Electrical Work Cost

Electrical work includes much more than installing switches. A modern double-storey house needs proper circuits, protection and earthing.

  • Electrical wiring
  • Conduits
  • Switch boxes
  • Light points
  • Fan points
  • AC points
  • Kitchen sockets
  • TV points
  • Internet/LAN points
  • CCTV conduits
  • Doorbell
  • Main distribution board
  • MCBs/breakers
  • Earthing
Estimated electrical budget: Rs 4–8 lakh depending on brands, number of points and lighting specification.

Plumbing, Sewerage & Water Tank Cost

Plumbing should include hot and cold water supply, sewerage, bathroom drainage, kitchen drainage, roof drainage, underground tank, overhead tank and water pump.

  • PPRC hot/cold water pipes
  • UPVC sewerage pipes
  • Floor drains
  • Water valves
  • Underground water tank
  • Overhead water tank
  • Water pump
  • Kitchen plumbing
  • Bathroom plumbing
Estimated plumbing budget: Rs 3–5 lakh.

Bathroom & Sanitary Cost

A typical double-storey 5 Marla house may have three to four bathrooms depending on the floor plan.

Bathroom Specification Approx. Cost / Bathroom
Economy Rs 1.5–2 Lakh
Standard Rs 2–3 Lakh
Premium Rs 3–5 Lakh+
4 Standard Bathrooms Rs 8–12 Lakh

Kitchen Construction Cost

Kitchen cost depends heavily on cabinet material, hardware, countertop and design.

Economy Kitchen

Rs 3–4.5 Lakh
  • Laminated cabinets
  • Granite countertop
  • Standard sink
  • Standard faucet

Premium Kitchen

Rs 8–12 Lakh+
  • Premium finish
  • Premium hardware
  • Quartz/marble options
  • Custom storage

False Ceiling Cost

False ceiling is optional but widely used in modern Pakistani homes for lighting and interior design.

  • Gypsum board ceiling
  • PVC ceiling in selected areas
  • LED downlights
  • LED profiles
  • Simple decorative borders
Recommended budget: Rs 2.5–6 lakh depending on how much of the house receives false ceiling and how decorative the design is.

Paint, Putty & Wall Finishing Cost

A proper paint system normally includes surface preparation, putty, primer and final coats. Exterior walls should use a suitable weather-resistant finish.

Paint Level Estimated Budget
Economy Rs 3–4 Lakh
Standard Rs 4.5–6 Lakh
Premium Rs 7 Lakh+

Modern 5 Marla House Exterior & Elevation Cost

A modern elevation can include paint, tiles, stone, textured finishes, aluminium features, lighting, boundary wall and a front gate.

Cost-Saving Exterior Strategy

  • Use paint as the primary elevation finish
  • Use stone/tile only on focal areas
  • Keep the elevation geometrically simple
  • Use architectural lighting instead of excessive cladding
  • Choose a simple steel main gate
Typical exterior/elevation budget: approximately Rs 3–8 lakh, depending on design.

Labour & Contractor Cost

Labour can be handled through a labour-only contract or through a turnkey contractor. These are not the same thing.

Labour-Only Contract

  • You purchase construction materials.
  • Contractor supplies workers.
  • You have more control over material quality.
  • Potentially lower overall cost.
  • Requires more supervision from the owner.

Turnkey Contractor

  • Contractor manages material procurement.
  • Labour and construction are managed by contractor.
  • More convenient for owner.
  • Usually includes contractor profit/margin.
  • Specification must be written into contract.
Best approach: If you have the time and can supervise procurement, a labour-contract model can provide better cost control. If you cannot supervise the project, a reputable turnkey contractor may be worth the additional cost.

Complete 5 Marla House Construction Cost Breakdown

The following is a practical planning budget for a double-storey house of approximately 1,900–2,000 sq ft covered area.

Construction Category Economy Recommended
Foundation + Structure Rs 25 L Rs 30 L
Masonry + Plaster Rs 8 L Rs 10 L
Plumbing Rs 3 L Rs 4 L
Electrical Rs 4 L Rs 6 L
Tiles / Flooring Rs 6 L Rs 8 L
Doors + Windows Rs 7 L Rs 10 L
Kitchen Rs 3.5 L Rs 5.5 L
Bathrooms + Sanitary Rs 5 L Rs 7 L
False Ceiling Rs 2.5 L Rs 4 L
Paint Rs 3 L Rs 5 L
Staircase + Railings Rs 2 L Rs 3 L
Water Tanks + Pump Rs 1.5 L Rs 2 L
Lights + Fans Rs 2 L Rs 3 L
Wardrobes + Woodwork Rs 3 L Rs 5 L
Exterior + Gate Rs 3 L Rs 5 L
Miscellaneous Rs 2 L Rs 3 L
Contractor / Labour / Management Rs 8–10 L Rs 10–12 L
Estimated Total ~Rs 90–98 Lakh ~Rs 1.10–1.25 Crore

How to Reduce 5 Marla House Construction Cost

Reducing construction cost does not mean reducing structural quality. The smarter approach is to reduce unnecessary finishing expenses while maintaining structural and safety standards.

Good Places to Save Money

  • Use locally manufactured tiles.
  • Keep elevation simple.
  • Limit expensive stone and cladding.
  • Use standard-size windows.
  • Choose laminated kitchen cabinets.
  • Use simple gypsum ceilings.
  • Avoid unnecessary decorative wall panels.
  • Use standard sanitary fittings.
  • Buy materials in planned quantities.
  • Compare at least 2–3 supplier quotations.

Where You Should NOT Cut Costs

  • Foundation
  • Structural steel
  • Concrete quality
  • Waterproofing
  • Electrical wiring
  • Electrical breakers
  • Earthing
  • Plumbing pipes

Common 5 Marla House Construction Mistakes

1

No Proper BOQ

Starting construction without a detailed bill of quantities makes cost control difficult.

2

Cheap Steel

Structural steel should be selected according to the engineer's specification.

3

No Soil Assessment

Foundation requirements can change considerably with soil conditions.

4

Changing Design Midway

Design changes after construction starts can cause major wastage and additional labour.

5

Ignoring Waterproofing

Waterproofing should be planned before finishing work.

6

Cheap Electrical Work

Saving on cables, breakers or earthing can create serious long-term problems.

Frequently Asked Questions

How much does it cost to build a 5 Marla house in Pakistan in 2026?
A typical double-storey 5 Marla house of around 1,900–2,000 sq ft can require approximately Rs 90 lakh to Rs 1.25 crore depending on construction quality, city, material selection and finishing.
How much does a 5 Marla double-storey house cost in Rawalpindi?
A standard double-storey 5 Marla house in Rawalpindi can fall roughly in the Rs 1.08–1.27 crore range depending on specification and market rates.
How many cement bags are required for a 5 Marla house?
A planning estimate for a 1,900–2,000 sq ft double-storey house is approximately 700–830 cement bags. The actual requirement should be calculated from the construction drawings and BOQ.
How much steel is required for a 5 Marla double-storey house?
A preliminary estimate is around 4.5–5 tons of Grade-60 reinforcement steel, although the final quantity depends on structural design and soil conditions.
How many bricks are required for a 5 Marla house?
Approximately 50,000–63,000 bricks may be required for a typical double-storey house, depending on wall layout, openings and covered area.
What is the grey structure cost of a 5 Marla house?
A practical 2026 planning range for a double-storey 5 Marla house is approximately Rs 60–75 lakh, depending on structural specification and material rates.
What is included in grey structure?
Grey structure normally includes excavation, foundation, RCC columns, beams, slabs, brickwork, plaster, damp-proofing and concealed electrical/plumbing provisions.
Is a labour contract cheaper than a turnkey contractor?
A labour-only contract can be cheaper because the owner purchases materials directly. However, it requires more supervision and procurement management. A turnkey contractor is more convenient but normally includes contractor margin and management costs.
Is the cost calculated according to plot size or covered area?
Construction cost is generally calculated according to covered area. Plot size alone does not determine the construction cost.
How long does it take to construct a 5 Marla double-storey house?
A complete house can take approximately 8–13 months, depending on design approval, labour availability, procurement, weather and finishing specifications.
What should I not compromise on when building a house?
Avoid compromising on structural design, foundation, reinforcement steel, concrete quality, waterproofing, electrical wiring, breakers, earthing and plumbing. Decorative finishes are better areas for cost reduction.

Planning to Build Your House?

Before starting construction, compare the plot size, covered area, material specifications, contractor quotation and complete BOQ. A properly planned construction budget can prevent major cost overruns later.

Explore Reliable Marketing
Cost Disclaimer: Construction prices in Pakistan change frequently. The rates and quantities in this guide are indicative planning estimates based on current 2026 market references. Actual costs can vary according to city, society, supplier, brand, transport, labour, soil condition, architectural design and finishing specification. Always obtain a current written quotation and detailed BOQ before starting construction.