5 Marla House Construction Cost in Pakistan 2026
A complete A-to-Z guide to building a modern double-storey 5 Marla house — including grey structure, cement, steel, bricks, sand, crush, tiles, windows, doors, paint, electrical, plumbing, kitchen, bathrooms, false ceiling, labour and contractor costs.
5 Marla House Construction Cost in 2026
The cost of constructing a 5 Marla house in Pakistan depends on the covered area, city, structure, material quality, finishing specification and contractor. A double-storey 5 Marla house in Rawalpindi or Islamabad can cost substantially more than a basic shell because the final budget includes flooring, doors, windows, kitchen, bathrooms, electrical work, plumbing, paint and other finishing items.
For a typical double-storey house of approximately 1,900–2,000 square feet covered area, a realistic 2026 planning budget is approximately Rs 90 lakh to Rs 1.25 crore, depending on quality. Premium specifications can push the budget considerably higher.
5 Marla Double-Storey House Construction Cost
For budgeting purposes, the following ranges can be used for a typical 5 Marla double-storey house. These are planning ranges, not fixed contractor quotations.
Economy Construction
- Basic but usable finishing
- Local good-quality tiles
- Standard aluminium windows
- Simple false ceiling
- Economical sanitary fittings
- Simple elevation
Recommended Standard
- Good-quality structural materials
- Modern porcelain flooring
- Good aluminium/uPVC windows
- Modern kitchen
- Quality sanitary fittings
- Modern elevation
Premium Finish
- Premium flooring
- Premium kitchen
- Better doors and windows
- Decorative ceilings
- Higher-end sanitary
- Premium exterior elevation
Current Construction Material Rates in Rawalpindi & Islamabad 2026
Material prices can change because of brand, quantity, transport, supplier and market conditions. The following figures are useful as a budgeting benchmark.
| Material | Approx. Rate | Unit | Budgeting Note |
|---|---|---|---|
| Cement | Rs 1,400–1,550 | 50kg Bag | Brand and dealer dependent |
| Grade-60 Steel | Rs 245–265 | Kg | Verify mill/dealer rate |
| A-Class Bricks | Rs 17–27 | Piece | Quality and transport affect price |
| Sand | Rs 120–140 | CFT | Source and quality dependent |
| Crush / Aggregate | Rs 145–165 | CFT | Quality and delivery affect price |
| Floor Tiles | Rs 350–700+ | Sq Ft | Local to premium options |
| Aluminium Windows | Rs 2,000–3,500+ | Sq Ft | Profile, glass and hardware dependent |
5 Marla Double-Storey House Material Quantity Estimate
For approximately 1,900–2,000 sq ft covered area, the following quantities can be used as an initial budgeting estimate. The final BOQ must be prepared from the architectural and structural drawings.
Foundation & Excavation Cost
Foundation work is the first major construction stage. It includes site layout, excavation, soil preparation, PCC, reinforcement, footings, columns, foundation walls, DPC, backfilling, termite treatment and plinth-level work.
Site Layout
Mark the house according to approved architectural drawings.
Excavation
Excavate according to structural and soil requirements.
Footings
Construct reinforced concrete footings as designed by the engineer.
Columns
Install reinforcement and cast structural columns.
DPC
Install damp-proofing to reduce rising damp problems.
Backfilling
Properly compact filling before floor and plinth construction.
5 Marla House Grey Structure Cost
Grey structure generally includes excavation, foundation, reinforced concrete columns, beams, slabs, brick masonry, plaster, damp-proofing and embedded electrical and plumbing work.
| Grey Structure Component | Estimated Budget |
|---|---|
| Foundation & excavation | Rs 7–11 Lakh |
| Steel / Sariya | Rs 11.5–13.5 Lakh |
| Cement | Rs 10.5–12.5 Lakh |
| Bricks | Rs 9–13 Lakh |
| Sand | Rs 3–4.5 Lakh |
| Crush / Aggregate | Rs 2.6–4 Lakh |
| Binding wire & miscellaneous | Rs 1–2 Lakh |
| Rough plumbing & electrical conduits | Rs 1.5–3 Lakh |
| Grey structure labour | Rs 10–15 Lakh |
| Estimated Grey Structure | Rs 60–75 Lakh |
Cement & Steel Requirement for a 5 Marla House
How Much Cement Is Required?
A typical 5 Marla double-storey house may require approximately 700–830 bags of cement, depending on the structural design and finishing work.
How Much Steel Is Required?
A practical initial estimate is around 4.5–5 tons of Grade-60 reinforcement steel.
The actual quantity should come from the structural engineer's bar bending schedule rather than a generic internet estimate.
Bricks, Sand & Crush Quantity
| Material | Approx. Quantity | Typical Use |
|---|---|---|
| A-Class Bricks | 50,000–63,000 | Walls and masonry |
| Sand | 3,000–3,800 CFT | Concrete, masonry, plaster |
| Crush | 2,000–2,500 CFT | RCC structure |
| Binding Wire | 100–150 KG | Steel reinforcement |
Plaster & Masonry Cost
Internal and external plaster should include proper surface preparation and treatment at brickwork-to-RCC junctions.
- Internal wall plaster
- External wall plaster
- Ceiling plaster where required
- Corner finishing
- Mesh at critical RCC/masonry junctions
- Surface preparation
Floor Tiles & Flooring Cost
Flooring is one of the most visible parts of a house. For an economical modern house, locally available porcelain or ceramic tiles can provide a good balance between appearance and cost.
Recommended Economical Specification
- 60×60 cm porcelain tiles for living areas
- Anti-slip tiles for bathrooms
- Kitchen floor tiles
- Bathroom wall tiles
- Kitchen backsplash
- Proper tile adhesive/grout
Doors & Windows Cost for a 5 Marla House
| Item | Economy | Average |
|---|---|---|
| Main Entrance Door | Rs 1–2 Lakh | Rs 2–4 Lakh |
| Bedroom Doors | Rs 30–50k each | Rs 50–80k each |
| Bathroom Doors | Rs 15–30k | Rs 30–50k |
| Aluminium Windows | Rs 2,000–2,700/sq ft | Rs 2,700–3,500+/sq ft |
| Total Doors + Windows | Rs 5–6.5 Lakh | Rs 7–10 Lakh |
Electrical Work Cost
Electrical work includes much more than installing switches. A modern double-storey house needs proper circuits, protection and earthing.
- Electrical wiring
- Conduits
- Switch boxes
- Light points
- Fan points
- AC points
- Kitchen sockets
- TV points
- Internet/LAN points
- CCTV conduits
- Doorbell
- Main distribution board
- MCBs/breakers
- Earthing
Plumbing, Sewerage & Water Tank Cost
Plumbing should include hot and cold water supply, sewerage, bathroom drainage, kitchen drainage, roof drainage, underground tank, overhead tank and water pump.
- PPRC hot/cold water pipes
- UPVC sewerage pipes
- Floor drains
- Water valves
- Underground water tank
- Overhead water tank
- Water pump
- Kitchen plumbing
- Bathroom plumbing
Bathroom & Sanitary Cost
A typical double-storey 5 Marla house may have three to four bathrooms depending on the floor plan.
| Bathroom Specification | Approx. Cost / Bathroom |
|---|---|
| Economy | Rs 1.5–2 Lakh |
| Standard | Rs 2–3 Lakh |
| Premium | Rs 3–5 Lakh+ |
| 4 Standard Bathrooms | Rs 8–12 Lakh |
Kitchen Construction Cost
Kitchen cost depends heavily on cabinet material, hardware, countertop and design.
Economy Kitchen
- Laminated cabinets
- Granite countertop
- Standard sink
- Standard faucet
Standard Kitchen
- Better cabinets
- Good hardware
- Granite/quartz options
- Modern storage
Premium Kitchen
- Premium finish
- Premium hardware
- Quartz/marble options
- Custom storage
False Ceiling Cost
False ceiling is optional but widely used in modern Pakistani homes for lighting and interior design.
- Gypsum board ceiling
- PVC ceiling in selected areas
- LED downlights
- LED profiles
- Simple decorative borders
Paint, Putty & Wall Finishing Cost
A proper paint system normally includes surface preparation, putty, primer and final coats. Exterior walls should use a suitable weather-resistant finish.
| Paint Level | Estimated Budget |
|---|---|
| Economy | Rs 3–4 Lakh |
| Standard | Rs 4.5–6 Lakh |
| Premium | Rs 7 Lakh+ |
Modern 5 Marla House Exterior & Elevation Cost
A modern elevation can include paint, tiles, stone, textured finishes, aluminium features, lighting, boundary wall and a front gate.
Cost-Saving Exterior Strategy
- Use paint as the primary elevation finish
- Use stone/tile only on focal areas
- Keep the elevation geometrically simple
- Use architectural lighting instead of excessive cladding
- Choose a simple steel main gate
Labour & Contractor Cost
Labour can be handled through a labour-only contract or through a turnkey contractor. These are not the same thing.
Labour-Only Contract
- You purchase construction materials.
- Contractor supplies workers.
- You have more control over material quality.
- Potentially lower overall cost.
- Requires more supervision from the owner.
Turnkey Contractor
- Contractor manages material procurement.
- Labour and construction are managed by contractor.
- More convenient for owner.
- Usually includes contractor profit/margin.
- Specification must be written into contract.
Complete 5 Marla House Construction Cost Breakdown
The following is a practical planning budget for a double-storey house of approximately 1,900–2,000 sq ft covered area.
| Construction Category | Economy | Recommended |
|---|---|---|
| Foundation + Structure | Rs 25 L | Rs 30 L |
| Masonry + Plaster | Rs 8 L | Rs 10 L |
| Plumbing | Rs 3 L | Rs 4 L |
| Electrical | Rs 4 L | Rs 6 L |
| Tiles / Flooring | Rs 6 L | Rs 8 L |
| Doors + Windows | Rs 7 L | Rs 10 L |
| Kitchen | Rs 3.5 L | Rs 5.5 L |
| Bathrooms + Sanitary | Rs 5 L | Rs 7 L |
| False Ceiling | Rs 2.5 L | Rs 4 L |
| Paint | Rs 3 L | Rs 5 L |
| Staircase + Railings | Rs 2 L | Rs 3 L |
| Water Tanks + Pump | Rs 1.5 L | Rs 2 L |
| Lights + Fans | Rs 2 L | Rs 3 L |
| Wardrobes + Woodwork | Rs 3 L | Rs 5 L |
| Exterior + Gate | Rs 3 L | Rs 5 L |
| Miscellaneous | Rs 2 L | Rs 3 L |
| Contractor / Labour / Management | Rs 8–10 L | Rs 10–12 L |
| Estimated Total | ~Rs 90–98 Lakh | ~Rs 1.10–1.25 Crore |
How to Reduce 5 Marla House Construction Cost
Reducing construction cost does not mean reducing structural quality. The smarter approach is to reduce unnecessary finishing expenses while maintaining structural and safety standards.
Good Places to Save Money
- Use locally manufactured tiles.
- Keep elevation simple.
- Limit expensive stone and cladding.
- Use standard-size windows.
- Choose laminated kitchen cabinets.
- Use simple gypsum ceilings.
- Avoid unnecessary decorative wall panels.
- Use standard sanitary fittings.
- Buy materials in planned quantities.
- Compare at least 2–3 supplier quotations.
Where You Should NOT Cut Costs
- Foundation
- Structural steel
- Concrete quality
- Waterproofing
- Electrical wiring
- Electrical breakers
- Earthing
- Plumbing pipes
Common 5 Marla House Construction Mistakes
No Proper BOQ
Starting construction without a detailed bill of quantities makes cost control difficult.
Cheap Steel
Structural steel should be selected according to the engineer's specification.
No Soil Assessment
Foundation requirements can change considerably with soil conditions.
Changing Design Midway
Design changes after construction starts can cause major wastage and additional labour.
Ignoring Waterproofing
Waterproofing should be planned before finishing work.
Cheap Electrical Work
Saving on cables, breakers or earthing can create serious long-term problems.
Frequently Asked Questions
How much does it cost to build a 5 Marla house in Pakistan in 2026?
How much does a 5 Marla double-storey house cost in Rawalpindi?
How many cement bags are required for a 5 Marla house?
How much steel is required for a 5 Marla double-storey house?
How many bricks are required for a 5 Marla house?
What is the grey structure cost of a 5 Marla house?
What is included in grey structure?
Is a labour contract cheaper than a turnkey contractor?
Is the cost calculated according to plot size or covered area?
How long does it take to construct a 5 Marla double-storey house?
What should I not compromise on when building a house?
Planning to Build Your House?
Before starting construction, compare the plot size, covered area, material specifications, contractor quotation and complete BOQ. A properly planned construction budget can prevent major cost overruns later.
Explore Reliable Marketing